Insta Masonary Bond
Brick / Block Jointing Mortar
Insta MASONARY BOND is a high-quality binding material that is designed for joining various types of masonary units such as blocks, fly ash bricks, and concrete blocks. It is a pre-mixed, instant dry mortar that is easy to use and provides superior strength.
Insta MASONARY BOND is a high-quality binding material that is designed for joining various types of masonary units such as blocks, fly ash bricks, and concrete blocks. It is a pre-mixed, instant dry mortar that is easy to use and provides superior strength.
Insta Masonary Bond makes it a reliable choice for masonary usage, as it ensures that the finished product is strong, durable, and long-lasting.
Advantages
- Easy and Fast Application.
- Pre-packed to overcome site batch variations.
- Water Seepage from joints are negligible.
- Easy in mixing as Instant Mortar.
- Convenient to store.
- Easy to Handle.
Technical Details
Appearance | Powder Form | Efflorescence | Negligible |
Colour | Grey | Bulk Density | 1650-1700 KG / M3 |
Water for Mixing | 14 to 15% | Wet Density | 2000-2100 KG / M3. |
Pot Life | Approx 90 to 120 mins. | Shelf Life | 6 months from the date of manufacturing in sealed condition. |
Compressive Strength of mortar in 28 Days | 10Mpa to 12 Mpa | Packing Size | 40/50 Kg Bags |
Area of Application
- Jointing Mortar for Fixing of All types of Bricks
- AAC Blocks
- Solid and Hollow Concrete Blocks
- etc
- Jointing Mortar for Fixing of All types of Bricks
- AAC Blocks
- Solid and Hollow Concrete Blocks
- etc
Mixing and Application
- Clean the surface to make it free from dust, loose particles and foreign material.
- Place the first layer on floor using normal sand-cement mortar due to undulation in level of floor.
- Lay the brick / blocks of first layer with proper levelling using sprit level, water tube, and other levelling tools.
- Once first layer is set, now start second layer using Insta Masonary Bond thick bed mortar.
- For mixing, mix Insta Masonary Bond jointing mortar with approx. 14-15% of water by weight.
- Mix first for 5-10 minutes by hand or electrical mixer to mix homogeneously.
- Allow mortar to stand for next 2-3 minutes so that additives react with water.
- Wet the jointing surfaces of blocks before applying mortar.
- Spread the mortar in such a way to maintain the thickness.
- Do not disturb the wall after application of mortar for at least 24 hours. The setting time is affected by climatic conditions, allow more time accordingly.
Do's & Don'ts
- 1. Use all the contents of Bags in one go, remaining material will get hard if in contact with air.
- 2. Always at Powder to Water and never add water in powder.
- 3. In first course of block laying, cement-sand mortar in the ratio of 1:4 or equivalent should be used. Check for perfect levelling of block course using sprit level. Give sufficient time to hard the joint in first course. Brick / Block once set must not be disturbed.
- 4. After 1.2 meter, horizontal reinforced bond beam is recommended to provide strength and stability to wall and protection from cracks.
- 5. Chicken mesh is recommended to use in concrete joints at corners, electrical junction boxes and conducting slots.
- 6. For Long wall Vertical mullion to be provided at every 3meter.
- 7. Hacking should be properly done on RCC surface before commencement of Block work.
- 8. Maintain proper consistency of mix for proper adhesion.
- 9. Top most gap of approx 15 – 20mm between wall and beam should be filled with lean concrete, backer rod etc.
Safety Measures
Use Hand Gloves
Goggles
Nose Mask
Safety Helmet
Safety Shoes
Jacket
Safety Measures
- Use Hand Gloves, Goggles, Nose Mask, Safety Helmet, Shoes ad Jacket while carrying out the work.
- In case of contact with eyes, wash with plenty of clean water and seek medical advice.
- After finishing of work, wash hands using soap.